Restoration efforts are in full swing for the bridge damaged by recent flooding at Mahandri on the Mansehra-Naran road (N-15). In a statement, Spokesperson for the National Highway Authority Dr. Sohail Aftab said that a pedestrian path has been restored in Mahandri Bazar. He said that the NHA is working swiftly to facilitate vehicular movement through the Compact 200 Bridge. This acceleration of restoration work follows recent emergency measures ordered by NHA Chairman Shehryar Sultan, who inspected the site in the past few days. Source: Radio Pakistan
Restoration efforts in full swing for bridge damaged by recent flooding at Mahandri
ECP Halts Local Government Election Programme in Islamabad
November 13, 2026
Dar Emphasizes Sustained Efforts for Austerity Goals
November 13, 2026
Pakistan and Trkiye Leaders Discuss Economic Cooperation at COP31 Summit
November 13, 2026
Nigar Johar Reviews Drug Control Operations in Khyber Pakhtunkhwa
November 13, 2026
Government Pledges Support for Revival of Pakistan Hockey
November 13, 2026